The following works were performed:
- installation/dismantling of scaffolding
- arrangement of the roof truss system
- installation of the batten, waterproofing membrane and counter-lattice
- installation of metal tiles
- installation of end strips, ridge, drippers
- installation of the drainage system
- lining of overhangs with plastic
- cleaning and removal of construction waste