The following works were performed:
- installation/dismantling of scaffolding
- arrangement of the roof truss system
- installation of the batten, waterproofing membrane and solid OSB batten
- installation of the underlayment
- installation of bitumen tiles
- installation of end strips, ridge, drippers
- cleaning and removal of construction waste